The standard requires a minimum clearance of 3m (10 ft) from high Voltage lines or you must de-energize the lines if you have to get closer. 3m (10ft) plus 100mm (4in) for every 10kV above 50kV. Follow the steps below to determine if the 30-10-10 ft. Aerial Cable Installation Pathway Separation When placing, installing, or rearranging communication cables and service drops, including optical fiber, copper and coax, the proper clearance requirements must be maintained. This safety zone also mitigates most EMI, and power induction issues. The Fiber Optic Association, Inc. (FOA) was founded in 1995 to help develop the workforce to build the fiber optic networks to support a rapid expansion in communications and the Internet. The charter of the FOA was to promote professionalism in fiber optics through education, certification, and. Abstract:The design, installation, and protection of wire and cable systems in substations are covered in this guide, with the objective of minimizing cable failures and their consequences. Other than that you haven't provided much information, given.
[PDF Version]